One yard management to the end: the communication "peripheral materials" management into "clear account"

Published:2026-11-25 Source:中国工信新闻网-信息技术 Views:16

From September 22 to 23, the national finals of the Green Supply Chain track of the 4th "Xinlv Cup" Innovation Competition on Information and Communication Technology Empowering Carbon Peak and Carbon Neutrality, co-hosted by the China Communications Enterprise Association and the China Academy of Information and Communications Technology, concluded in Beijing. The project "Tianyi Smart Warehouse—Demonstration of Green Supply Chain End-Management and Rapid Reuse," submitted by China Telecom Jiangsu, won first prize in the Green Supply Chain Management category. What deserves more attention than the trophy itself is the hard work behind it. A procurement supply chain team of a provincial company has made a set of measurable, reproducible and sustainable management changes to the common problem of "unmanageable peripheral materials" that has plagued the communications industry for many years: 713 team-level unmanned warehouses and 739 intelligent storage cabinets in the province, serving more than 13000 front-line personnel, collecting materials more than 870000 times in total, with a material collection accuracy rate of 100 and more than 2.5 million old terminals, one year to save equipment procurement costs of about 0.3 billion yuan. This report card, in the context of the deepening and upgrading of the reform of state-owned enterprises and the strategy of "changing the number of clouds to wisdom and benefit", is more than one award. It addresses a more fundamental question: as digitalization enters deeper waters, what enables state-owned enterprises to ensure that management is truly implemented down to the "last person"? The Last-Mile Dilemma: The One Kilometer That's Hardest to Manage Is Precisely the One Most Prone to Accidents Peripheral supplies in the telecommunications industry are inherently difficult to manage. The set-top box in the business hall, the optical cable network cable for the maintenance team and the spare parts for the emergency station have many categories, wide distribution and fast circulation. A province often has thousands of storage points and tens of thousands of employees. For a long time, these materials have been registered in manual ledgers and taken care of by part-time personnel: a sum of money has been recorded in the paper book, the number of handover points has been recorded, the serial code has not been recorded, the system has not been set up, and the responsibility has not been reached. Accounts do not match, materials "run drip", the use of cumbersome, response lag, almost a common problem in the industry. Looking at these phenomena together, the crux is not that people in a certain link do not fulfill their duties, but that "the responsibility does not fall on specific people". The materials are "recorded" on the provincial and municipal ledgers but "missing" from the team‑level inventory; the recovery rate is listed on the performance‑evaluation form, yet it cannot be matched to the serial number of any specific piece of equipment. Collective responsibility can easily become unaccountable in the end. The judgment of Jiangsu Telecom's procurement supply chain team is that this is not a problem that can be solved by "a few more devices". The process and responsibilities must be re-smoothed first, and then digitized to solidify it. Change the process first, then go to the system: let the responsibility penetrate to the "last person" Reform begins with the "interface." In the past, demand, procurement, warehousing, usage, and recycling were handled by separate departments, so everyone could claim, "That's not my responsibility." Jiangsu Telecom re-divided the whole chain of material management: the demand side clearly explained "what to buy, how much to buy, when to arrive, and where to get the money"; the procurement side managed "how to buy, who to find to buy, and what rules to buy"; the storage and use side was responsible for "consistent accounts, compliance with collection, and timely payment of old money. Only when the interface is clear and the interface is clear can we talk about standardized operations. The second cut is at the "level". Jiangsu Telecom has set up a four-level penetration control network of "provincial centralized warehouse-municipal sub-warehouse-team unmanned warehouse/intelligent cabinet-personal virtual warehouse", sinking the accounts originally staying at the provincial and municipal levels all the way to team shelves and personal names. Each item is assigned a unique digital identity upon receipt, with a "one item, one code" system applied throughout the entire lifecycle—procurement, warehousing, transfer, issuance, use, return, reuse, and disposal. To obtain a new item, the old one must be returned first, and the system automatically verifies code consistency. The whereabouts of supplies are traceable, usage is controllable, and losses can be prevented; for the first time, management accountability has been specified down to "who collected them, how many units were taken, where they were installed, and when they will be returned." The third cut targets "working methods." Relying on the self-developed cloud-side collaboration platform, unmanned warehouses and intelligent lockers all over the province realize 7 × 24-hour unattended and self-service collection: face recognition plus dynamic two-dimensional code double verification, strong correlation between collection and maintenance work order, second-level automatic approval, single material collection from 9.5 minutes to 1 minute, and emergency material collection response from more than 4 hours to less than 10 minutes (see fig. 1). Figure 1: Real-life scene of unmanned warehouse and smart locker self-service retrieval in the work team This is accompanied by the reconstruction of the supply mode-changing "people looking for things" into "people looking for things", predicting the demand of outlets with big data, preparing materials and sorting in advance, and "shuttle bus" intensive distribution. The next day in urban areas and the third day in villages and towns will be reached, and the inventory turnover rate will be increased from 66% to 200. Smart cabinets are put into cabinets by groups and replenished by orders. The system automatically triggers replenishment warning when the inventory is lower than the threshold. Unattended cabinets completely turn the "collection" into a code scanning and a face brushing (see Figure 2). Figure 2: Schematic of automated replenishment alerts, unattended operation, and one-click issuance tasks

After overhauling the process, the most noticeable change is that the role of "part-time warehouse manager" has virtually disappeared. More than 90% of part-time management staff at the province's last-mile warehouses have been cut; tasks that previously relied on manual monitoring and paper-based record-keeping have been handed over to systems and smart hardware. A Single Ledger: What Exactly Has the Reform Saved? The biggest risk in managing change is failing to keep the numbers straight. Jiangsu Telecom has broken down the outcomes of its reforms into several verifiable sets of indicators and is comparing them item by item: The score must be settled in "money." The terminal old-age cycle was pressed from 15 days to 3 to 5 days, and the old-age rate was raised from less than 30 per cent to 55 per cent; the disposal of idle waste materials was moved to the online auction platform, and online bidding allowed the "sleeping assets" to continue to increase in value, raising the disposal premium rate from 18 per cent to 31.5 per cent. Achieve efficiency through management by reengineering processes and revitalizing existing assets. The account also counts on "risk. With a unique code for each item and robust system validation, processes that once relied on individual compliance are now enforced: issuance requires a work order, returns must be matched to serial numbers, and transfers are tracked. Vulnerabilities such as manual ledgers, lack of serial-number verification, and arbitrary selection of recycling types no longer have a place in this system. A team: change "manage procurement" to "manage materials" This system is not bought, it is changed. Leading the effort is Jiangsu Telecom's Procurement and Supply Chain Management Department—a unit that previously focused solely on "purchasing"—which has proactively positioned itself to oversee the entire lifecycle of materials. The method is very simple: the team squatted to the front-line team, followed the clothing maintenance personnel through the complete process of picking up, using and paying back the materials, and calibrated the system on paper inch by inch at the scene. Why do optical cables always get more? Because a roll can only be scrapped when it is unpacked and cannot be used up. Why is the smart cabinet left on the second floor and nobody uses it? Because it is not cost-effective for the maintenance personnel to carry the tool kit up and down. These details, sitting in the office can't think of, can only go to the scene to find. Once identified, each item is converted into a rule and documented as an SOP, then handed over to the system for execution. Supporting the main business is the industrial power. According to the main-reality coordination mechanism of "setting standards for the main business, strong control, excellent service for the industry, and heavy landing", supporting units such as Jiangsu Zhongbo Communication Co., Ltd. Undertake specific work such as warehousing and logistics organization, on-site deployment of intelligent cabinets and unmanned warehouses, digital twin modeling, small and micro ICT, and supply chain guarantee for recycling materials and office supplies at business outlets, and put the standards and rules set by the main business on every warehouse and every equipment. The standard is produced by the main business, and the landing is done by the industry. The interface is clear and the responsibility is clear. Assessment follows responsibility. Recycling rate, reuse rate, inventory‑account reconciliation rate, and timely material issuance rate are incorporated into monthly performance evaluations, with corresponding incentives for proactive resource recovery; teams that perform well receive rewards, while those that underperform must explain the reasons. The "last meter" of management relies on these seemingly trivial mechanisms. A Spillover Effect: From the "Jiangsu Model" to a National Strategy The "Jiangsu model" of peripheral smart warehouses is expanding beyond Jiangsu Province. At present, this program has been extended to Beijing, Shanghai, Guangdong, Zhejiang, Hunan, Ningxia, Inner Mongolia and other provinces (autonomous regions and municipalities), with a total of more than 100 teams and groups to carry out pilot projects. Jiangsu Telecom has compiled its own polished practices into a set of solutions to solve the difficult problems of enterprise management materials, called "Tianyi Smart Warehouse", and is committed to becoming a demonstration base and iterative research and development operation base for the operator industry: on the one hand, it has been deeply applied in the province, exploring new practices, straightening out business processes and precipitating standard operating procedures in work practice; On the other hand, through continuous IT research and development and intelligent hardware polishing, turn the "Jiangsu approach" into a standard model that can be replicated externally. Telecom operators across the country have a large amount of peripheral materials to manage; government agencies have a wide range of points, and they are most afraid of "small physical vaults" and leaks; large state-owned enterprises and central enterprises have many branches, and material management is generally extensive. The same set of "intelligent hardware plus IT system" combination can be used in another scene. The transformation of a team warehouse seems to be a trivial matter. However, putting it in the coordinates of the reform of state-owned enterprises, it answers the questions of whether the management can fall to the people, whether the benefits can be calculated, and whether the experience can be copied out. Jiangsu Telecom's answer is: first put the responsibility on the "last person", then write the process as the "last line of code", and finally turn the practice into the "standard that can be taken away". This is also the most specific appearance of the 16 words "sunshine procurement, green supply, digital intelligence operation, and value far-reaching" in the peripheral warehouse.

Not sure which licenses your business needs?
8 quick questions, a tailored licensing report in 60 seconds, with requirements and fee references